Well the house is coming along. That roof has been a HUGE job.
They are now sheeting it and then we can finally be dried in!
In the meantime Dad has been working on the stairs going down into the basement.
And here is where we will have the stairs going down from the family room.
I'm excited to see some progress being made down stairs as this is where
the boys rooms will be. 3 bedrooms and a bathroom on this side next to the stairs.
Looks like Dad is getting ready to put the wall up between the mechanical room
and the theatre room here. On the othere side of the wall will be room to put in
a small kitchen area....someday.
Here is the back entrance into the basement.
Here's a look at the family room looking out the windows on either
side of the fireplace. Master suite on the right and kitchen on the left.
Here is a view thru the wall into our master bedroom closet
and then thru to the bathroom where you can see the window in the middle.
And on either side of these rooms is our bedroom on
one side and our office on the other.
Here a view of that whole side of the house.
Here is a view of the kitchen area looking from the bay window
and out thru the kitchen into the laundry room and pantry.
Last but not least is the back of the house.
Tomorrow is a big day as the weather is supposed to be pretty good
and Dad is anxious to get us all dried in.
We've been picking out colors of stucko, tile, hardwood, granite, windows and stone too. I'll try to get some pictures soon to post later.
So, we are getting there slowly but surely!






















